Nemport Port Connection Line, which has been completed within the scope of the project of connecting the ports to the railway, was opened to loading and unloading traffic.
The junction line that leaves the Biçerova station and goes to Nemport Port is a total of 3 km long, and there are 484 loading and unloading roads with a length of 2 meters. In the junction line; A total of 3 simple trusses and 3470 meters long railway ferrules and 92 meters long 4-foot viaducts were made.
Be the first to comment