Izmir tram starts

Izmir tram started: Izmir Metropolitan Municipality, Konak and Karşıyaka delivered the place on the tram, work began. Both projects will be realized by a local company.

The tram projects prepared by İzmir Metropolitan Municipality in order to breathe in the urban traffic are experiencing a happy ending. Mansion and Karşıyaka Gülermak Ağır San. A.Ş., which is the first advantageous company for the two projects opened after the rejection of the objection to the construction tender of tramways by the JCC (Public Procurement Authority). Const. And Taah. A.Ş., the contract was signed and the place was delivered and the works started.

Fahrettin Altay Square, which will start from the side of the market tram line, peak times of the 3'er minutes, the other time period is planned to work in the 4-5 minute intervals. Şehit Binbaşı Ali, where the Tax Office is located, will go to the shore following the Tufan Street, and without any intervention from the side where Mustafa Kemal Sahil Boulevard is located on the dwellings and on the road, 3 departs and 3 will proceed parallel to the highway traffic.

In Konak, the tram line that runs from the side of the road leading to the Gazi Boulevard under the pedestrian bridge in front of the Izmir Metropolitan Municipality and Konak Pier will enter Şehit Fethi Bey Street and from there on, it will use the route with the highway traffic. Following the Republic Square, the line will go to Şehit Nevres Boulevard and from there to Şair Eşref Boulevard. The tram line is going to be divided into two. The line which will continue in this way until Vahap Özaltay Square will be reunited near Alsancak Station. Following the Gar, the tram line that goes to Şehitler Street will end at the Halkapınar Warehouse Area of ​​İzmir Metro. Izmir Metropolitan Municipality, Poet Esref Bulvari has changed the project in order to protect the mulberry trees in the middle center.

KARŞIYAKA TRAMVAYI

Alaybey-Karşıyaka- 9.7 kilometer route between Mavişehir and 15 stop and 17 tram line with two vehicles will work as a round-trip. Karşıyaka tram, starting from Alaybey by the coast Bostanlı Pier, and then Ismail Sivri Street, Martyr Cengiz Topel Street, Selcuk Yasar Street and Cahar Dudayev Boulevard followed by Izban Cigli Warehouse facilities next to Mavisehir Suburban Station. In project scope Karşıyaka an overpass or underpass is planned to connect the pier with the bazaar. The tram line will provide transfer to İZBAN, ferries and buses.

Be the first to comment

Leave a response

Your email address will not be published.


*